Purchase these Items

Products mentioned in this Article

--None--
 

 

Fighting First: US Forces In North Africa 1942-43

Step 1. Begin assembly of the Stuart by attaching the right-hand side track to the hull section.  Step 2. Next, attach the left-hand side track to the hull section.
Assembling The Sherman Assembling The Sherman Assembling The Sherman
Below: Both tracks in place.  Step 3. Next, attach the hull rear piece to the rear of the hull section.
Assembling The Sherman Assembling The Sherman Assembling The Sherman
Step 4. Mount the upper hull on the lower hull assembly. Step 5. Attach the glacis.
Assembling The Sherman Assembling The Sherman Assembling The Sherman
Below: Glacis in place.
Step 6. Choose an open or closed turret piece.
Assembling The Sherman Assembling The Sherman
Step 7. Assemble the main turret pieces. Below: Assembled turret.
Assembling The Sherman Assembling The Sherman
Step 8. Attach the main gun to the turret. Step 9. Next, attach the MG to the turret.
Assembling The Sherman Assembling The Sherman Assembling The Sherman
Below: Mounted MG.
Step 10. Glue your choice of commander in to the open hatch.
Assembling The Sherman Assembling The Sherman
Below: Commander in position. Note: You can choose a magnet sleeve or turret peg.
Assembling The Sherman Assembling The Sherman
Step 11. Glue the pet in place. Step 12. Mount the turret on to the hull assembly.
Assembling The Sherman Assembling The Sherman
Below: A fully assembled M3 Stuart.
Assembling The Sherman


Last Updated On Sunday, August 27, 2017 by Charlie at Battlefront